1,215 GW requested, concentrated in Italy, Germany and Sweden.
Our first monthly reading of the connection queues and capacity maps Europe's grid operators now have to publish. 3 countries account for 75% of all requested capacity we can measure. Signed contracts are not in this figure: they count as Reserved.
What changed since the last reading
Operators overwrite their maps; we keep every snapshot. This is the part of the report nobody else can write: which sites gained or lost capacity, and which queues grew.
- Norway: queue, demand, 2026 (national)Norway · queuemore requested
- Norway: queue, demand, 2025 (national)Norway · queueless requested
- Norway: queue, generation (national)Norway · queuemore requested
- Norway: queue, generation, 2025 (national)Norway · queuemore requested
- Alvarado 220Spain · queueless requested
- Norway: queue, generation, 2024 (national)Norway · queuemore requested
- Carmona 400Spain · queueless requested
- JāņciemsLatvia · available capacityless available
Where the requests are
The largest requested total we can measure is in Italy (708 GW), followed by Germany (128 GW) and Sweden (74.0 GW). These are not like-for-like: some operators publish every request received, others only requests with an offer. Accepted offers and contracts count as Reserved, so the UK and Ireland, whose registers hold contracts, are not in this ranking. We take, per country, the single largest consistent publication and never add transmission and distribution queues together.
- 01ItalyTerna (Econnextion)708 GW
- 02Germany50Hertz128 GW
- 03SwedenEllevio74.0 GW
- 04SpainRed Eléctrica72.0 GW
- 05AustriaAPG58.9 GW
- 06FranceRTE (ODRE)53.6 GW
- 07RomaniaTranselectrica27.0 GW
- 08NorwayStatnett25.6 GW
- 09NetherlandsNetbeheer Nederland (DSOs)21.1 GW
- 10BAElektroprenos BiH16.0 GW
- 11PolandEnerga Operator13.8 GW
- 12LithuaniaLitgrid6.4 GW
- 13SerbiaEMS3.9 GW
- 14United KingdomNGED2.0 GW
- 15LuxembourgCreos1.8 GW
- 16PortugalE-REDES960 MW
- 17CroatiaHEP ODS802 MW
- 18LatviaSadales tīkls572 MW
- 19MoldovaMoldelectrica0.4 MW
The most congested regions
Regional figures show where requests pile up. Southern Italy dominates on volume, driven by solar and stand-alone batteries in Puglia and Sicilia. In Sweden, the load queue in the north reflects industrial electrification and data centres.
- 01PugliaItaly172 GW
- 02SiciliaItaly117 GW
- 03LombardiaItaly72.2 GW
- 04Norrbottens länSweden15.7 GW
- 05Nouvelle-AquitaineFrance15.5 GW
- 06Castilla y LeónSpain11.3 GW
- 07Kronobergs länSweden10.5 GW
- 08Västernorrlands länSweden10.1 GW
Italy: batteries and data centres join the line
Italy's queue of 708 GW is no longer a renewables story alone. Stand-alone storage requests total 252 GW, and data-centre requests 108 GW, of which 47 GW in Lombardia. Most requests will never be built, but each one occupies a study slot and shapes where Terna plans new lines.
- 01Lombardia47.3 GW
- 02Piemonte14.6 GW
- 03Lazio13.9 GW
- 04Puglia8.1 GW
- 05Veneto7.4 GW
- 06Emilia-Romagna6.2 GW
Largest requests per site
At site level the picture is sharper. In France, Caparéseau lists queued renewable capacity per substation under the regional S3REnR schemes.
- 01Niederösterreichload14.1 GW
- 02Niederösterreich12.2 GW
- 03Steiermarkload4.0 GW
- 04Steiermark4.0 GW
- 05Oberösterreichload3.6 GW
- 01Bosnia and Herzegovina – Solarne Elektrane8.3 GW
- 02Bosnia and Herzegovina – Vjetroelektrane3.4 GW
- 03Bosnia and Herzegovina – Termoelektrane1.8 GW
- 04Bosnia and Herzegovina – Postrojenja Za Skladištenje Električne Energijestorage1.1 GW
- 05Bosnia and Herzegovina – Hibridna Postrojenja883 MW
- 01Eula (EU)load5.5 GW
- 02Altentreptow Süd (ATS)5.2 GW
- 03Altentreptow Süd (ATS)load5.2 GW
- 04Eula (EU)4.4 GW
- 05Graustein (GRS)3.8 GW
- 01Noord-Hollandload3.0 GW
- 02Flevopolder, Utrecht en Gelderland2.1 GW
- 03Limburgload1.7 GW
- 04Limburg1.6 GW
- 05Flevopolder, Utrecht en Gelderlandload1.0 GW
How full are the grids?
Queue size is one half of the story; the other is how many substations can still take a new connection at all. Of the countries that publish headroom per site, Bulgaria has the highest share of sites with no capacity left (87%). In Germany, the first DSO allocation maps classify 90% of 599 substations as low capacity.
The Netherlands publishes status per supply area rather than megawatts: 311 of 563 areas have a waiting list for new demand connections, with 8.1 GW queued in those areas alone.
Method and caveats
- All figures are taken from operator publications as archived on 18 November 2026. They are indicative and non-binding.
- Requested means applied for or offered. Accepted offers and signed contracts count as Reserved and are not in these totals. What each operator publishes differs; the sources page says what its figures hold.
- We never add transmission and distribution queues of the same country together, and drop national roll-ups when regional rows exist.
- Forward horizons (e.g. Creos 2030 and 2035) and duplicate map layers are shown but not counted.
- This is the first issue. From next month every figure comes with a change versus the previous reading, from our daily archive.
Full source list and update cadence: Sources and coverage. How totals are built: Methodology and FAQ.
Get issue 02 in your inbox
Next month we publish the first month-on-month changes: which substations freed up capacity, and which queues grew.