VIESGO
Spain · 100 sites tracked · checked 5 h ago
Requested
784 MW
Generation 345 MW · Demand 439 MW
Sites with none available
50%
Sites
100
100 on the map
Sites with capacity available
98
0 more limited
Largest queues
Llano La Pasiega
substation
147 MW
0 MW available
Sanzo
substation
130 MW
1.8 MW available
El Palo
substation
51.1 MW
83.6 MW available
Tanos
substation
47.3 MW
0.6 MW available
Riaño
substation
45 MW
0 MW available
Corrales
substation
30 MW
0 MW available
Renedo
substation
28 MW
0 MW available
Estelo
substation
13.4 MW
100 MW available
Poligono Baiña
substation
12.6 MW
0 MW available
P.T. Santander
substation
10 MW
0 MW available