UFD (Naturgy)
Spain · 675 sites tracked · checked 5 h ago
Requested
977 MW
Generation 977 MW
Sites with none available
83%
Sites
675
675 on the map
Sites with capacity available
117
0 more limited
Largest queues
Asturias C.t. Narcea
substation
154 MW
154 MW available
Segovia Lastras Del Pozo
substation
74 MW
0 MW available
Pontevedra Pazos De Borben
substation
70 MW
47.1 MW available
Madrid Campo Naciones Nuevo
substation
50 MW
64.7 MW available
Pontevedra Lourizan
substation
50 MW
10.1 MW available
La Coruña La Grela 2
substation
46.7 MW
21.1 MW available
Madrid Aragon
substation
40 MW
0 MW available
Madrid Rejas
substation
33 MW
25 MW available
Madrid Pinar
substation
30 MW
31 MW available
Madrid Puente Princesa
substation
30 MW
65.7 MW available
Where these figures come from
Free · monthly
Alerts for UFD (Naturgy)
We'll tell you when UFD (Naturgy) publishes new capacity or its queue changes.