CNMC (all Spanish DSOs)
Spain · 624 sites tracked · checked 5 h ago
Requested
1.4 GW
Generation 441 MW · Demand 921 MW
Sites with none available
54%
Sites
624
624 on the map
Sites with capacity available
289
0 more limited
Largest queues
Se Puerto De Gijon
substation
104 MW
0 MW available
Se Pumarin
substation
95 MW
20 MW available
S.e. Maestrazgo
substation
80 MW
0 MW available
Se Pumarin
substation
64 MW
0 MW available
St_costa-Vera
substation
58 MW
69.1 MW available
Se San Esteban
substation
46.6 MW
3.6 MW available
Se Carrio
substation
46 MW
0 MW available
Se Grado
substation
45 MW
4.2 MW available
Se Grado
substation
45 MW
0 MW available
Se Villaviciosa
substation
40 MW
0 MW available