2 operators · checked 5 h ago

Slovenia

0% of published sites have no capacity available.

Requested
—
Sites with none available
0%
Sites we track
46
46 on the map
History since
Nov 2026
every snapshot kept, checked daily
Every site in Slovenia

46 sites

Podlog 400 kV
HV switchyard
ELES
200 MW
Podlog 110 kV
HV switchyard
ELES
200 MW
Selce 110 kV
HV switchyard
ELES
200 MW
Divača 400 kV
HV switchyard
ELES
200 MW
Okroglo 110 kV
HV switchyard
ELES
200 MW
Okroglo 400 kV
HV switchyard
ELES
200 MW
Maribor 400 kV
HV switchyard
ELES
200 MW
Cirkovce 400 kV
HV switchyard
ELES
200 MW
Kidričevo 110 kV
HV switchyard
ELES
200 MW
Kleče 220 kV
HV switchyard
ELES
200 MW
Kleče 110 kV
HV switchyard
ELES
200 MW
Beričevo 400 kV
HV switchyard
ELES
200 MW
Beričevo 220 kV
HV switchyard
ELES
200 MW
Beričevo 110 kV
HV switchyard
ELES
200 MW
Hudo 110 kV
HV switchyard
ELES
200 MW
Krško 400 kV
HV switchyard
ELES
200 MW
Krško 110 kV
HV switchyard
ELES
200 MW
Velenje 110 kV
HV switchyard
ELES
180 MW
Škofja Loka 110 kV
HV switchyard
ELES
160 MW
Jeklarna 110 kV
HV switchyard
ELES
140 MW
Trnovlje 110 kV
HV switchyard
ELES
130 MW
Pivka 110 kV
HV switchyard
ELES
130 MW
Dekani 110 kV
HV switchyard
ELES
130 MW
Lendava 110 kV
HV switchyard
ELES
130 MW
Sladki vrh 110 kV
HV switchyard
ELES
130 MW
Dobruška vas 110 kV
HV switchyard
ELES
130 MW
Sežana 110 kV
HV switchyard
ELES
120 MW
Vrtojba 110 kV
HV switchyard
ELES
120 MW
Rače 110 kV
HV switchyard
ELES
120 MW
Slovenj Gradec 110 kV
HV switchyard
ELES
120 MW
Lenart 110 kV
HV switchyard
ELES
120 MW
Radenci 110 kV
HV switchyard
ELES
120 MW
Mačkovci 110 kV
HV switchyard
ELES
120 MW
Idrija 110 kV
HV switchyard
ELES
110 MW
Tolmin 110 kV
HV switchyard
ELES
110 MW
Krško DES 110 kV
HV switchyard
ELES
110 MW
Podlog DES
HV switchyard
ELES
110 MW
Ormož 110 kV
HV switchyard
ELES
90 MW
Ožbalt 110 kV
HV switchyard
ELES
80 MW
Ruše 110 kV
HV switchyard
ELES
80 MW
Rogaška Slatina 110 kV
HV switchyard
ELES
80 MW
Šentjur 110 kV
HV switchyard
ELES
70 MW
Žalec 110 kV
HV switchyard
ELES
70 MW
Radvanje 110 kV
HV switchyard
ELES
40 MW
Korund 110 kV
HV switchyard
ELES
30 MW
Sevnica 110 kV
HV switchyard
ELES
30 MW

Indicative, as published by the operators.

Who publishes this data in Slovenia
ELES
92 figures on this sitefirst snapshot
ELES
collected, not shown yetfirst snapshot
SODO / Elektro DSOs (SODOkart)
collected, not shown yet3 snapshots kept
Free · monthly

Get alerts for Slovenia

Be the first to know when Slovenia's operators publish new capacity, or when queues at the sites you follow change.