BA

16.0 GW requested for a grid connection.

Requested
16.0 GW
Generation 14.9 GWStorage 1.1 GW
Sites with none available
—
Sites we track
6
6 on the map
History since
Apr 2021
every snapshot kept, checked daily
Every site in BA

5 sites

Bosnia and Herzegovina – Solarne Elektrane
country
Elektroprenos BiH
8.3 GW
225 requests
Bosnia and Herzegovina – Vjetroelektrane
country
Elektroprenos BiH
3.4 GW
43 requests
Bosnia and Herzegovina – Termoelektrane
country
Elektroprenos BiH
1.8 GW
8 requests
Bosnia and Herzegovina – Hibridna Postrojenja
country
Elektroprenos BiH
883 MW
21 requests
Bosnia and Herzegovina – Hidroelektrane
country
Elektroprenos BiH
484 MW
16 requests

Indicative, as published by the operators.

Who publishes this data in BA
Elektroprenos BiH
collected, not shown yetfirst snapshot
Elektroprenos BiH
6 figures on this site5 snapshots kept